Power Automate: Instant Low-Code Plugins To Run PowerFx Code

Power Automate: Instant Low-Code Plugins To Run PowerFx Code

Power Automate can run PowerFx code by calling an instant low-code plugin. An instant low-code plugin can take inputs from Power Automate, perform operations using PowerFx and then return the result to Power Automate. This is exciting because you can use the PowerFx language you know and love from elsewhere in Power Platform while not having to remember any Power Automate functions.

And as a bonus you can also call an instant low-code plugin from Power Apps to execute complex logic server-side instead of on-device.

Table of Contents
• Introduction: The Net Work Days Instant Plug-inInstall The Dataverse Accelerator AppCreate An Instant Low-Code PluginDefine Input And Output Parameters For A Low-Code PluginWrite A PowerFx Expression For The Low-Code PluginSave The Low-Code Plug-in To A SolutionTest The Low-Code Plug-In In The API PlaygroundCall The Instant Low-Code Plug-In From A Power Automate FlowRun The Power Automate Flow And Get The Low-Code Plug-in Output




Introduction: The Net Work Days Instant Plug-in

An instant low-code plugin is used in a Power Automate flow to calculate net work days in similar manner to the Excel NETWORKDAYS function.



The low-code plug-in takes a start date and end date as inputs and outputs the net work days as an integer value.




Install The Dataverse Accelerator App

Low-code plugins are built using the Dataverse Accelerator app which comes pre-installed with new environments. An older environment may not have it installed. To install the Dataverse Accelerator app go to the Power Platform Admin Center, then browse to Resources > Dynamics 365 Apps. The Install the app named Dataverse Accelerator.



Select an environment and press the Install button.



After the Dataverse Accelerator is installed a new application called Dataverse Accelerator App appears in the environment.




Create An Instant Low-Code Plugin

There are two types of low-code plug-ins: Instant and Automated . An instant plug-in is triggered manually by performing an unbound action in Power Automate or Power Apps. An automated plug-in is triggered when a record in the specified table is created, updated or deleted.

We want to make an instant plug-in. Open the Dataverse Accelerator app and create an instant plug-in.




Define Input And Output Parameters For A Low-Code Plugin

A low-code plugin can include input parameters and output parameter. To calculate the net work days we will need both.

Name the instant plug-in “Net Work Days”. Then add two string type parameters Start Date and End Date. We will use a string data type because Power Automate does not have a data type for dates.



Then create an outputs parameter with an integer data type named Days. The plugin will take a start date and end date as inputs and output the net work days as a whole number.




Write A PowerFx Expression For The Low-Code Plugin

Plugins use PowerFx code to perform operations and return a result. In a prior article, I showed how to calculate the business days excluding weekends in Power Apps. We can re-use the same code from that app inside the low-code plugin.



Copy and paste this code into the Expression field of the instant low-code plugin. To output the net work days we include a record with the parameter with Days as a field.

{
    Days: With(
        {
            // generate a one-column table of all dates between start date & end date
            varStartDate: DateTimeValue(StartDate),
            varEndDate: DateTimeValue(EndDate)
        },
        If(
            And(
                IsBlank(varStartDate),
                IsBlank(varEndDate)
            ),
            // show nothing if any date pickers are blank
            0,
            // include only dates Monday to Friday
            CountIf(
                // generate a one-column table of all dates between start date & end date
                ForAll(
                    Sequence(varEndDate - varStartDate + 1),
                    varStartDate + Value - 1
                ),
                Weekday(Value) in [2, 3, 4, 5, 6]
            )
        )
    )
}




Save The Low-Code Plug-in To A Solution

Once the low-code plugin setup is completed we want to save it to a solution. Choose a solution from the dropdown and give the plugin a description. Select the global scope because the low-code plugin is not associated with any specific table.



Save the low-code plugin.



A success notification appears at the top of the page.



And the plugin is added to the solution along with its other component parts.




Test The Low-Code Plug-In In The API Playground

A low-code plug-in can be tested before using it in Power Automate or Power Apps. Go to the API Playground by pressing the Update icon and clicking the Test in API Playground button that appears in the success notification.



Dates in Power Automate are expressed as a text string. For example, the date November 1, 2024 could be shown as “2024-11-01” or “2024-11-01T00:00:00Z”.

Choose the Net Work Days instant plug-in, fill in the query parameters with these values and then press send:

  • StartDate: 2024-11-01
  • EndDate: 2024-11-30



The instant low-code plugin outputs a responses with Days equal to 21.



The work days for November 2024 are shown on this calendar. There are 21 work days.




Call The Instant Low-Code Plug-In From A Power Automate Flow

The low-code plugin is completed. Now we want to call it from a Power Automate flow. Create a new instant flow named Net Work Days Calculation.



Include two date type parameters in the flow trigger: Start Date and End Date.



Instant low-code plugins can be called as unbound actions in Dataverse. Add a Dataverse – Perform an unbound action to the Power Automate flow.



Select the action named NetWorkDays. Supply the Start Date and End Date from the flow trigger as parameters.




Run The Power Automate Flow And Get The Low-Code Plug-in Output

We’re done. It’s time to test our instant low-code in the Power Automate flow. Run the flow and choose a Start Date of 2024-11-01 and an End Date of 2024-11-30.





The flow run completes successfully.



And “Days”: 21 can be found in the perform an unbound action outputs.





Questions?

If you have any questions or feedback about Power Automate: Instant Low-Code Plugins To Run PowerFx Code please leave a message in the comments section below. You can post using your email address and are not required to create an account to join the discussion.

Matthew Devaney

Subscribe
Notify of
guest

9 Comments
Oldest
Newest
Inline Feedbacks
View all comments
John B
2 days ago

Thanks for the article, Matthew
As low-code plugins are in preview, I suppose this functionality is not meant to be used in production.
Do you agree?
Thanks

John B
2 days ago

I appreciate the reply and your view, thanks, Matthew. It seems to be a practical and flexible approach to features in preview

John B
2 days ago

I appreciate the reply and your view, thanks, Matthew. It seems to be a practical and flexible approach to features in preview

Bob Lamaster
Bob Lamaster
12 hours ago
Reply to  John B

I would generally agree with Matthew. However, changes to features, or even broken ones, do happen and you have to accept more risk with features that are *recently* added to preview.

For example, although this article isn’t about the similar capability to run automated plugins, you may be tempted to experiment with that as I did. At the time of this writing, an automated plugin, such as one that fires when a record is created, can’t currently reference “ThisRecord”, even though you’ll see tutorial videos where it works fine. Even the built-in suggestion to use “Set(NewRecord.<fieldname>,<newvalue>)” doesn’t work. It was working at one time, but not now. If you were using automated plugins in production, you’d have a big mess on your hands with no workarounds.

Matthew… I hope you do a tutorial on automated plugins once they’re working again! 🙂

Steve Albano
Steve Albano
1 day ago

Incredibly useful and helpful as always, Matthew! How would I allow 2 outputs though? I am trying to take in 5 dates in Excel format (INT) and output 5 corresponding Dataverse dates (yyyy-MM-dd) but can’t seem to get it to work.

Steve Albano
Steve Albano
1 day ago
Reply to  Steve Albano

Aaaaaactually the issue was that the plug-in code checker is VERY slow and I kept making changes that were eventually accepted as valid code. Once I learned to be patient it was easy.

Screenshot 2024-10-28 100941.png
Thierno DIALLO
Thierno DIALLO
16 hours ago

Thanks for sharing Mattew